The Senate2023-07-172023-07-172022-10-06http://196.202.208.105:80/xmlui/handle/123456789/15686enOn-Spot Assessment of the Status of ImplementationEAC One Stop Border PostRusumo Hydro-Electric InfrastructuresReport on the On-Spot Assessment of the Status of Implementation of the EAC One Stop Border Post (Elegu-Nimule, Kobero-Kabanga and Rusumo) and the Rusumo Hydro-Electric Infrastructures (25th - 28th October 2021)2021Technical Report