Report on the On-Spot Assessment of the Status of Implementation of the EAC One Stop Border Post (Elegu-Nimule, Kobero-Kabanga and Rusumo) and the Rusumo Hydro-Electric Infrastructures (25th - 28th October 2021)2021
| dc.contributor.author | The Senate | |
| dc.date.accessioned | 2023-07-17T09:45:38Z | |
| dc.date.available | 2023-07-17T09:45:38Z | |
| dc.date.issued | 2022-10-06 | |
| dc.identifier.uri | http://196.202.208.105:80/xmlui/handle/123456789/15686 | |
| dc.language.iso | en | en_US |
| dc.subject | On-Spot Assessment of the Status of Implementation | en_US |
| dc.subject | EAC One Stop Border Post | en_US |
| dc.subject | Rusumo Hydro-Electric Infrastructures | en_US |
| dc.title | Report on the On-Spot Assessment of the Status of Implementation of the EAC One Stop Border Post (Elegu-Nimule, Kobero-Kabanga and Rusumo) and the Rusumo Hydro-Electric Infrastructures (25th - 28th October 2021)2021 | en_US |
| dc.type | Technical Report | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Report on the On-Spot Assessment of the Status of Implementation of the EAC One Stop Border Post (Elegu-Nimule, Kobero-Kabanga and Rusumo) and the Rusumo Hydro-Electric Infrastractures 2021.pdf
- Size:
- 27.78 MB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description:
