Office of the Auditor-General2023-08-242023-08-242021-02-18http://196.202.208.105:80/xmlui/handle/123456789/21747enAuditor-GeneralKENHAReport of the Auditor-General on EPC Turn Construction of Five Footbrigde and T-Mall Flyover in Mombasa and Langata for the Ended 30 June 2020Technical Report